Daniel Bishop: Posted on 13 May 2011 17:08
Hi everyone, all the tile hanging is now complete. You can see from the second photo how i have weathered with the lead to the adjoining property.
|
|
Daniel Bishop: Posted on 12 May 2011 18:24
 Hi Everyone, I know that you can't see alot from this photo but we have felt and batterned all the outside. We have also done all the lead work. I will have better photos tomorrow of the tile hanging which should be finished. Thanks
|
|
Daniel Bishop: Posted on 07 May 2011 20:09
|
Daniel Bishop: Posted on 04 May 2011 19:52
Here is the second blog with the work up to date. I have fitted all the rafters, flitch beams, stud partions and dorma cheeks. All have been inspected by the building inspector and passed. 
|
|
Daniel: Posted on 03 May 2011 20:10
Hi everyone, I have just started a loft conversion in Bromley with a L shaped dorma creating a master bedroom en-suite i will keep you all up to date with regular blogs and photos. Here is some of what is completed to date: stripped the old roof, fitted ridge beam, floor beams and just starting the dorma. Tomorrow we will be fitting the roof beams and finishing the dorma. I am waiting for finished photos of the refurbishment i have completed in station rd, Meopham should be getting them in the next few days. I have also done a mansard roof conversion in Wimbledon since my last blog. Regards Daniel Bishop
|
|