Posted on 21 March 2014 17:05
|
Posted on 25 February 2014 15:10
|
Posted on 18 February 2014 10:24
  Almost there... ceiling and walls painted, units finished, skirting and coving up and painted
Television fitted on wall, old boiler removed and replaced with new model
|
|
Posted on 06 February 2014 12:50
This week we have been tiling and grouting the walls and installing the solid wood worktops which need a few more coats of oil.
The large American style fridge / freezer finishes it off perfectly.
 We have finished laying the underfloor heating and these stunning floor tiles which need grouting still
|
|
Lisa Bouchard: Posted on 29 January 2014 21:46
 This week we have knocked down a wall to create a large kitchen / diner area which will also have a bar.  A new Magnet kitchen is being supplied and installed to the clients specification  A complete new boiler system will be installed to replace existing A new tiled floor will be laid with underfloor heating  This large barn is currently used as a storage area and our clients are considering converting it into a games room
|
|